Stamped, clear embossed, & fussy cut the train out. Then less fussy cut a 2nd train and glued together to give some strength.
Cut 3 layers of Smokey Gray and staggered approx. 1/4". Then cut out tunnel. When all 3 are then layered it gave the inside left of tunnel some depth. Then used rock stamp all over front layer.
Right side of layers are flush against base. Left is raised w/ 1/4" dimensionals so that total height is 1/2". Tucked in the tracks. Used dimensionals in increasing sizes on train.
Date: Saturday, January 23, 2016 GMT Views: 566
Favorited:2